Drilling For Gas.com
  • Home
  • Drilling
    • Standards
    • Hole Problems
    • Directional
    • Rig Move
    • Calculations (Excel)
    • Slim Hole
    • Offshore
    • Misc. (Drilling)
  • Well Control
    • Planning
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Equipment
  • Checklists
    • Pre-spud
    • Drilling
    • Casing
    • Cementing
    • Completion
    • Misc. Checklists
  • Casing
    • Casing Types
    • Load Cases
    • Preliminary Design
    • Special Design
    • Connections
    • Corrosion, Wear, Fatigue
    • Casing Operations
  • QHSE
  • Production
  • Completion
    • Design
    • Operations
    • Equipment
    • Misc. Completion
  • Evaluation
    • Coring
    • Logging
    • Mud Logging
    • Well Testing
    • Mics. Evaluation
  • Planning
  • Driling Fluids
    • Mud Types
    • QA QC
    • Testing
    • Solids Control
    • Losses
    • Contamination
    • Misc. Drill Fluids
  • Cementing
    • Planning
    • Casing
    • Cement Plugs
    • Evaluation
    • Remedial

Most Read

  • Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
  • Casing Make-Up Torque
  • HSE Plan (Example)
  • Basics of Electric Wireline Logging
  • Pressure Testing Standards
  • Drilling safety guidelines
  • Well Control Standards
  • Tripping Operations - Best Practices
  • Classification of BOP and well control equipment.
  • Waste Management Strategy - cuttings discharge
  • Sub-surface safety valves (SSSV)

Latest

  • Completion Operation - Best Practices
  • Drilling programme 12.25" section HPHT
  • Cold Weather Operations Checklist
  • Coring Checklist
  • Weatherford Overdrive casing running and pick up/lay down machine - Checklist
  • 16" Potential Problems - Best Practices
  • 12.25" guidelines for tripping, making connections and back reaming
  • 9 5/8" Wellhead and BOP Operations Checklist
  • Drilling program example (Semi-Sub)
  • Survey and Collision Avoidance Standards
  • Operation Programmes Standards
  1. You are here:  
  2. Drilling
  3. Hole Problems
Articles
Baryte plugs to cure losses
Formation Instability
How to avoid Hole Related Problems
Lost Sidewall Sample Bullets
When to Give Up Attempts to Free the Pipe
Effective Pull On Stuck Pipe
Stretch graph for 3.5" and 5" Drilll Pipe
Lost Circulation
Drilling Unconsolidated Formations
Chemical Cutters for Stuck Tubing or Drillpipe
Hole Cleaning
Changing a Bottom Hole Assembly
Responsibilities during Fishing Operations
Overpulls/ Stuck Pipe In Surface Hole
Miscellaneous Fishing Tools
Pilot Mill
Fishing with Junk Retrievers
Fishing with Junk Subs
Pipe Sticking
Backing off Procedures
Problems encountered in drilling extended reach and horizontal wells
Fishing tools selection
Junk Mill
Fishing with Washover Strings
Jarring precautions
Fishing Planning and Preparation
Fishing Guidelines
Fishing in slim hole wells
Differential Sticking (Cause of Stuck Pipe)
Use of Drag charts for hole cleaning - WellPlan
Stuck Pipe Prevention
Freeing Differentially Stuck Pipe
Taper Mills
Preventing Differential Sticking
Fishing with Spears
Spotting Fluids to Free Stuck Pipe
Backing-off procedure with top drive
Jarring Stuck Pipe
Stuck Casing - Remedial Action
Back-Off Procedures
Pulling Stuck Pipe
Mechanical Sticking (cause of stuck pipe)
Milling Guidelines
Fishing Assemblies and tools
Hole Cleaning Tips
Fishing Tools: Drilling/ Fishing Jars,Accelerators, Bumper Subs
Tripping Procedure in tight hole
Stuck Pipe - Free Point Determination
Fishing with Overshots