Drilling For Gas.com
Home
Drilling
Standards
Hole Problems
Directional
Rig Move
Calculations (Excel)
Slim Hole
Offshore
Misc. (Drilling)
Well Control
Planning
Primary Control
Secondary Control
Tertiary Control
Equipment
Checklists
Pre-spud
Drilling
Casing
Cementing
Completion
Misc. Checklists
Casing
Casing Types
Load Cases
Preliminary Design
Special Design
Connections
Corrosion, Wear, Fatigue
Casing Operations
QHSE
Production
Completion
Design
Operations
Equipment
Misc. Completion
Evaluation
Coring
Logging
Mud Logging
Well Testing
Mics. Evaluation
Planning
Driling Fluids
Mud Types
QA QC
Testing
Solids Control
Losses
Contamination
Misc. Drill Fluids
Cementing
Planning
Casing
Cement Plugs
Evaluation
Remedial
Search ...
Most Read
Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
HSE Plan (Example)
Pressure Testing Standards
Casing Make-Up Torque
Classification of BOP and well control equipment.
Basics of Electric Wireline Logging
Drilling safety guidelines
Connection types
Sub-surface safety valves (SSSV)
Well Control Standards
Tripping Operations - Best Practices
Latest
Completion Operation - Best Practices
Drilling programme 12.25" section HPHT
Cold Weather Operations Checklist
Coring Checklist
Weatherford Overdrive casing running and pick up/lay down machine - Checklist
16" Potential Problems - Best Practices
12.25" guidelines for tripping, making connections and back reaming
9 5/8" Wellhead and BOP Operations Checklist
Drilling program example (Semi-Sub)
Survey and Collision Avoidance Standards
Operation Programmes Standards
You are here:
Casing
Articles
Intermediate string
Liner
Production string
Surface string
Conductor string
Stove pipe, marine conductor or foundation pile
Casing types definitions
Connections Selection and ordering
Connections Surface treatments
Casing Thread protectors
Connections Testing and qualification
Connection Thread compounds
Connection sealing
Casing Thread Compounds Friction Factors
Reliability and structural integrity of connections
Connection types
Monitoring Casing Wear
Monitoring Casing Condition
Casing wear and solutions
Minimising Casing Wear
Influence of wear on casing strength
Influence of fatigue on casing strength
Influence of corrosion on casing strength
Weight Set Tie-Back Packer Make-Up
Casing Operations Responsibilities
Casing and Liner Operations Planning
Casing Patches
4 1/2" liner running program example
4 1/2" Liner running programme
Casing and Liner Handling
Casing and Liner Colour Codes
Ordering casing
Running and Setting Tie-Back Packer
External Casing Packers
Example Casing Centralisers Programme
13.3/8 " Casing Running Programme
Casing Centralisation
Tie-Back Packers - General Information
Procedure For Running 30” Conductor
Casing and Liner Running Preparation Guidelines.
Hole Conditioning before Running Casing or Liner
Tie-Back Packers - PBR Clean Out and Packer Setting
Casing Setting Depths
Preparation for Running Casing
Casing Storage, Handling and Transport
Liner Tie-Back String
Mandrel Casing Hangers
Liner Lap Testing - Inflow Testing
Casing and Liner Running Procedures
Running and Testing Casing
Casing and Liner Pressure Testing
7" Liner Operations (Running and Cementing)
Casing Make-Up Torque
Installation loads
Installation loads
Post-buckling analyses
Service loads
Service loads
Fundamental equation for reduced axial force
Pressure (Collapse and Burst) loads on casing
Stove pipe, foundation pile, marine conductor and conductor string
Load bearing capacity
Resistance to buckling
Burst loads
Collapse loads
Pressure loads (burst and collapse)
Casing Design Loads
Liner hanger selection - Design criteria
Detailed Design and Analysis
Basic aspects of rock mechanics
Casing Design parameters
Casing scheme selection
Casing design considerations
Procedures for leak-off and limit tests (LOT, LT, FIT)
Casing design factors
Gravity structure
Slim hole well
Permafrost well
Deep-water well
Reservoir compaction environment
Gas-lift well
HPHT well
Squeezing salt well
Steam well
Horizontal well