Drilling For Gas.com
Home
Drilling
Standards
Hole Problems
Directional
Rig Move
Calculations (Excel)
Slim Hole
Offshore
Misc. (Drilling)
Well Control
Planning
Primary Control
Secondary Control
Tertiary Control
Equipment
Checklists
Pre-spud
Drilling
Casing
Cementing
Completion
Misc. Checklists
Casing
Casing Types
Load Cases
Preliminary Design
Special Design
Connections
Corrosion, Wear, Fatigue
Casing Operations
QHSE
Production
Completion
Design
Operations
Equipment
Misc. Completion
Evaluation
Coring
Logging
Mud Logging
Well Testing
Mics. Evaluation
Planning
Driling Fluids
Mud Types
QA QC
Testing
Solids Control
Losses
Contamination
Misc. Drill Fluids
Cementing
Planning
Casing
Cement Plugs
Evaluation
Remedial
Search ...
Most Read
Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
HSE Plan (Example)
Pressure Testing Standards
Casing Make-Up Torque
Classification of BOP and well control equipment.
Basics of Electric Wireline Logging
Drilling safety guidelines
Connection types
Well Control Standards
Sub-surface safety valves (SSSV)
Tripping Operations - Best Practices
Latest
Completion Operation - Best Practices
Drilling programme 12.25" section HPHT
Cold Weather Operations Checklist
Coring Checklist
Weatherford Overdrive casing running and pick up/lay down machine - Checklist
16" Potential Problems - Best Practices
12.25" guidelines for tripping, making connections and back reaming
9 5/8" Wellhead and BOP Operations Checklist
Drilling program example (Semi-Sub)
Survey and Collision Avoidance Standards
Operation Programmes Standards
You are here:
Drilling
Directional
Articles
Surveying Wells with Anticipated Well Control Problems
Steerable Systems
Directional Surveying Standards
Gyro Surveys - QA/QC
Surveying Wells with No Anticipated Well Control Problems
Data Recording for Horizontal and ERD wells
Best Practices for Running Recoverable Survey Instruments
Declination and Grid Convergence Definition
Survey Programme Example
Conventional multi-shots magnetic survey tools: Pre-survey checklist & Running procedure
Electronic Magnetic Multi-Shots
Correction for Magnetic Azimuths
Teledrift - Inclination-only MWD
Surveying definitions
Surveying Responsibilities
Running procedures for solid state magnetic multi-shot directional survey tools
Solid state magnetic survey tools
Magnetic surveying techniques
Survey evaluation
Gyro Single Shots
Gyro Multi-Shots
Introduction to Magnetic Surveys
Magnetic Multi-Shots
Well Plots
Kick-off and Initial Build Section
Survey policy
Magnetic Single Shots
Measurement While Drilling (MWD) General Guidelines
Directional Drilling Responsibilities
Tie-In Data
BHA Components and Inspections
Conventional magnetic single-shot survey tools: Pre-survey checklist and Running procedures
Conventional magnetic survey tools
Slim hole, coiled tubing and under-balanced drilling surveying
Inertial Navigation Survey Systems
Survey tools and techniques
Directional drilling plan with hole opener and under-reamer
Measurement While Drilling (MWD) Tool
Directional Drilling Planning
Guidelines for Rotary Directional Drilling
Bit Selection and Hydraulics
North seeking gyro survey tools
Horizontal well surveying
Directional drilling plan with 12.25" pilot hole, 22" hole hole opener and 24" underreamer
Positional Uncertainty
Directional BHA considerations
Survey program and report
Wireline steering techniques
Non-Magnetic Drill Collars
North Seeking gyro - Common tools description
Directional Drilling Exercices
Measurement While Drilling (MWD) - QA/QC
Wireline Surveying Techniques
Borehole representation
Correction programmes for magnetic survey
Conventional gyro: pre-survey checklist and running procedure
Survey Programme
Wellpath planning and anti-collision monitoring - COMPASS
Conventional Gyroscopic Survey Tools
Definition of Surveying Terms
Introduction to Gyro Surveys
Measurement while drilling (MWD) - Introduction
Single-shot inclination-only survey tools (TOTCO)